Would it be possible to have a log for each job that is scheduled. As it is now the previous log is wiped out by the next job and if you don't get a chance to see it before the next job starts
thanks Tony
Job log
-
- Posts: 1699
- Joined: Thu May 23, 2013 7:57 am