Does FBackup or Backup4All have the option to run all Jobs in sequence? In other words, I'd like to be able to open the backup program and have it run all (or selected) jobs I've created without having to start them one at a time.
Thanks...
Running all Jobs one after another
-
- Posts: 1932
- Joined: Thu May 23, 2013 7:57 am
Re: Running all Jobs one after another
Hi,
You can do that only in Backup4all.
You can use tags to group the jobs and you can manually run the tag or you can schedule it.
Another possibility is to schedule all jobs to be executed.
In both cases, the backup jobs will run one after the other.
You can do that only in Backup4all.
You can use tags to group the jobs and you can manually run the tag or you can schedule it.
Another possibility is to schedule all jobs to be executed.
In both cases, the backup jobs will run one after the other.