FB execution mode reduces

Post here if you have problems installing or using FBackup
Post Reply
mimo57
Posts: 6
Joined: Sun Jul 15, 2012 2:19 pm

Post by mimo57 »

Hello,
Even after setting it to FB closes after backup, it does not close it. Besides, I can not run backups from the planners of FB in reduced mode (in the taskbar).
Thank you for your help


Adrian (Softland)
Posts: 1953
Joined: Thu May 23, 2013 7:57 am

Post by Adrian (Softland) »

Hi,
FBackup will close after a scheduled backup only if it was not running when the scheduler occurred.

In other words, only if the scheduler started FBackup, it will close after the backup is finished.

Do you know you can monitor your backups remotely with Backup4all Monitor? You can read more here: https://www.backup4all.com/backup4all-monitor.html

mimo57
Posts: 6
Joined: Sun Jul 15, 2012 2:19 pm

Post by mimo57 »

Hi,
Thank you for that answer, it is the function I want.

But my problem is that the planner opens FB, executes scheduled tasks, but once completed, the FB window remains open. I have to close by the X.

Also, I wish not to see this window FB, but just an icon in the taskbar.


Adrian (Softland)
Posts: 1953
Joined: Thu May 23, 2013 7:57 am

Post by Adrian (Softland) »

Hi,
In this case, you should open Backup Properties->Scheduler->Edit Properties.

In the Execute section, check the "Command line application" and "Hide window" options.

Do you know you can monitor your backups remotely with Backup4all Monitor? You can read more here: https://www.backup4all.com/backup4all-monitor.html

Post Reply