Page 1 of 1

Posted: Wed Mar 17, 2010 7:20 pm
by kevinm
I have five separate backup jobs. I have them scheduled, but also want on demand backup. I am looking for the ability to press one "Backup" button, and know that all my jobs will run. Is something like this possible? Thanks.


Posted: Thu Mar 18, 2010 8:32 pm
by Adrian (Softland)
Hi,
You cannot schedule the backup group in FBackup. That feature is available only in our commercial edition (Backup4all).
You can manually run all your backup jobs if you right click the FBackup tray icon and select "Backup Group" and "Backup My Backup Jobs Group".