Page 1 of 1
Posted: Mon Jan 31, 2011 8:57 pm
by Jiggers
In Scheduler Properties under Action what is the difference between Backup and Load?
Posted: Wed Feb 02, 2011 5:03 pm
by Adrian (Softland)
Hi,
The Backup option is used to run the backup.
The Load option is used to just load the backup job in FBackup.