Page 1 of 1

Posted: Fri Apr 22, 2011 10:33 pm
by msc
I have a suggestion that I feel with improve the already excellent FBackup utility.
I have 4 backup jobs, and run them each night with an auto-shutdown on the last job.
To do so, I use the "Group Backup" function in the taskbar.
When each of the 4 jobs are running, you can only see the status of the backup progress plus any messages regarding each job, only IF that job is highlighted by selecting it with a left mouse click.
I propose that with a GROUP BACKUP, each job is automatically selected as it's running and automatically cycles through the job list, so you can observe the progress and messages for each job in the group as they cycle through from top to bottom.
Thanks. Love FBackup !!!


Posted: Tue Apr 26, 2011 5:48 pm
by Adrian (Softland)
Hi,
We added your suggestion to our Wishlist.