Page 1 of 1

Simultaneous runs

Posted: Thu Aug 30, 2018 6:41 pm
by davewilk
Is it a good or bad idea to let more than one backup job run at a time?

That is, suppose I have several jobs that I want to run around midnight every day, and that each job typically runs a few minutes. Should I just start them all at midnight, or should I make some effort to stagger them?

Re: Simultaneous runs

Posted: Tue Sep 04, 2018 12:41 pm
by Adrian (Softland)
Hi,

FBackup can run multiple backups in the same time. If your computer has enough resources to run multiple backups in the same time, you can do that.

Re: Simultaneous runs

Posted: Wed Sep 05, 2018 4:41 pm
by davewilk
Softland wrote:FBackup can run multiple backups in the same time. If your computer has enough resources to run multiple backups in the same time, you can do that.
Thanks for the answer.