Individual Daily Backups
Posted: Fri Jan 17, 2025 11:01 pm
Is there a way to create 1 backup job that will create a full backup for each day of the week and at the end of the week you have 7 backup files (Sun, Mon,...Sat). The daily files should be over-written each week so I can always go back 7 days if needed to reload a file.
I can do this by creating a weekly job for each day of the week, but I was wondering if it is possible to do this operation with one backup job? I tried using the insert tag function to put in the day of the week name in the file name, but each night the new file overwrites the prior file day's file.
Thoughts??
Thanks.
I can do this by creating a weekly job for each day of the week, but I was wondering if it is possible to do this operation with one backup job? I tried using the insert tag function to put in the day of the week name in the file name, but each night the new file overwrites the prior file day's file.
Thoughts??
Thanks.