Run scheduled task after time has past

You can ask general questions, share opinions or advices about FBackup
Post Reply
abridge
Posts: 1
Joined: Sun Dec 11, 2011 8:10 pm

Post by abridge »

How can I set the scheduler so that, if I have the backup set for daily at 5:00pm, and the computer is off at that time, when I turn it on at say 7:00pm, it will then run the backup since it "missed" the actual time that day. I have other backup programs that have a setting for that that work that way. Thanks.


Adrian (Softland)
Posts: 1993
Joined: Thu May 23, 2013 7:57 am

Post by Adrian (Softland) »

Hi,
You can create the scheduled task with FBackup, then go to Control Panel->Administrative Tools->Task Scheduler, edit the task and check the option to run missed tasks as soon as the computer is started.

Please note it works only on Windows Vista, Windows 7 or higher.

Do you know you can monitor your backups remotely with Backup4all Monitor? You can read more here: https://www.backup4all.com/backup4all-monitor.html

Post Reply